It consists of a 500 seater main sanctuary, a Sunday school building, Caretaker's lodge and two utility buildings. The church which was funded communally was developed in 2 phases with the caretaker's lodge, sunday school and auxillary buildings developed as the 1st phase in 2002/2003 and the main sanctuary scheduled for dedication in October 2006.
The main sanctuary is a diamond shaped hall with triangular pods attached on all four sides. Two of these pods can be closed off and used independently or opened up and used as part of the main sanctuary. It features a sunken baptismal pool, an overhead gallery on a mezzanine floor and the church offices.
|